Power Solution
March 20, 2025
Feasibility study, Design
€8,000,000
The project involves the integrated development of a manufacturing-industrial complex, covering a total area of approximately 103,000 m2, resulting from the combination of existing and future developments.
The project involves new construction on an area of approximately 21,000 m2, already the subject of a preliminary design and in the final design phase, with the construction of: the main production building, a management/office building, and a building for supporting commercial activities.
Development of additional subdividable land for approximately 40,000 m2, intended for future production/logistics expansion or modular development for functional lots.
Enhancement of an existing built-up area of approximately 43,000 m2, including buildings and warehouses totaling approximately 12,000 m2 of covered space, to be subjected to a technical assessment for redevelopment, repurposing, or building replacement.
The entire project is structured according to a unified masterplan, with phased development, optimized construction times, infrastructure integration, and the adoption of industrialized construction technologies with high energy and functional performance.
The objective is to create a flexible, scalable and financially sustainable production hub, suitable for supporting the growth of the client’s industrial activity and generating real estate value in the medium to long term.

